CO-OPS Field Library

manuals, operating procedures, publications and more
View All

140 documents found.

Note: The library may contain third-party copyrighted material (used with permission). See our help section for details.

Document
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf
Author: Patrick Burke
Keywords/Tags: SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf
Author: Adam Grodsky;Richard Bourgerie
Keywords/Tags: SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf
Author: Eddie Roggenstein
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf
Author: Kasey Standridge
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf
Author: Robert Heitsenrether;OSTEP
Keywords/Tags: FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf
Author: Kasey Standridge
Keywords/Tags: ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros
5.4.1.1.C1_GOES_Enabled_Portable_Tide_Gauge_Setup&Use.pdf
Author: Caleb Gostnell;Lynn Asbeck;Keith Brkich
Keywords/Tags: 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,message,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
5.4.1.1.C2_Iridium_Enabled_Portable_Tide_Gauge_Setup&Use.pdf
Author: Keith Brkich;Caleb Gostnell;Daniel Johnson
Keywords/Tags: 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,Iridium,message,modem,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf
Author: OSTEP
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf
Author: Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf
Author: Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck
Keywords/Tags: SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf
Author: Darren Wright, James Sprenke, Charles Payton
Keywords/Tags: SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass
5.4.1.5.O_Hydraulic_Corrector_Field_Application_for_Referencing_the_International_Great_Lakes_Datum_of_1985_03-28-2012.pdf
Author: yumiko
Keywords/Tags:
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf
Author: Adam Grodsky, COET
Keywords/Tags: SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf
Author: Manoj Samant
Keywords/Tags: SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark
3.2.3.3.C18_Creating_a_Bench_Mark_Diagram_in_PDF_Format_SOP.pdf
Author: Loren Evory, FOD
Keywords/Tags: bench mark diagram, pdf, bm sketch, jpg, snagit, .des file, windesc, google earth, diagram, bm, ESS, Engineering and System Specifications, COET, Configuration and Operational Engineering Team
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf
Author: Engineering Division, CO-OPS
Keywords/Tags: bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical
3.2.3.3.C3_Users_Guide_for_Electronic_Levels_with_Translev_and_WinDesc.pdf
Author: Bruce L. Servary, Jr
Keywords/Tags: windesc, translev, leica, wild, na3000, na3003, .dat files, rod level bubble, level collimation checks, rec-module, dna03, keypad, screens, .inx file, fgcs standards, inst.dat files, rods.dat files, desc.exe, contrib.dat, country.dat, cors.dat, ssn, spsn, pid, descriptive text, wind code, weather code, sun code, observer code, error codes, user key, gif 10, dsworld, google earth
3.2.3.3.C4_Users_Guide_for_GPS_Observations.pdf
Author: Manoj Samant, Artara Johnson
Keywords/Tags: global positioning system, gps, observations, terrestrial reference frame, itrf, north american datum of 1983, nad 83, online positioning user service, opus, opusdb, national geodetic survey, ngs, static, gps observation, differential, gps surveys, gps satellites, choke ring antenna, ground plane antenna, fixed-height tripod, epoch update, recording interval, elevation mask, north american vertical datum of 1988, navd 88, national spatial reference system, nsrs, orthometric, ellipsoidal navd 88 level tie, gps tie, stability code, federal base network, fbn, cooperative base network, cbn, gps water level station bench mark, gpsbm, photos, cors
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf
Author: George Leigh, Curtis Smith, National Geodetic Survey (NGS)
Keywords/Tags: 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf
Author: George Leigh, Kevin Bashant, National Geodetic Survey (NGS)
Keywords/Tags: digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf
Author: George Leigh, Kevin Bashant, NGS
Keywords/Tags: concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf
Author: George Leigh, Kevin Bashant, NGS
Keywords/Tags: outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf
Author: Warren Krug;Kathleen Bailey
Keywords/Tags: FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
cGNSS_Field_Installation_Guide.pdf
Author: Robert Heitsenrether
Keywords/Tags:
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf
Author: Winston Hensley, Christopher Haith, Robert Heitsenrether
Keywords/Tags:
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf
Author: Kasey Standridge
Keywords/Tags: ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf
Author: FOD
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf
Author: CIL
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf
Author: Carl Kammerer
Keywords/Tags: ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf
Author: Carl Kammerer, CECAT
Keywords/Tags: FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf
Author: Chris Paternostro
Keywords/Tags: CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf
Author: Jennifer Ewald
Keywords/Tags: FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls
Author: Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary
Keywords/Tags: SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf
Author:
Keywords/Tags:
5.5.3.1.A_eSite_User's_Guide.pdf
Author: Trevor.Mackessy-Lloyd
Keywords/Tags: eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf
Author: Chris Paternostro
Keywords/Tags: ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
4.1.3.1_Chesapeake_Instrument_Lab_Equipment_Request_Form.pdf
Author:
Keywords/Tags:
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf
Author: Chris McGrath
Keywords/Tags: Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf
Author: CIL
Keywords/Tags: 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf
Author: U.S. Department of Commerce
Keywords/Tags: expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M
4.1.3.5_CIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf
Author: CO-OPS
Keywords/Tags: Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf
Author: CECAT
Keywords/Tags: freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf
Author: Bruce Servary, OET
Keywords/Tags: goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf
Author: Sutron Corporation
Keywords/Tags: COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf
Author: Thomas F. Landon
Keywords/Tags: ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.B.1.1_C-MIST_User_Manual.pdf
Author: Paul Fanelli;CECAT
Keywords/Tags: dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
6.2.1.1.2_LevelRodRe-Calibration.pdf
Author: Dave Hatcher
Keywords/Tags:
6.2.1.2.1_Tools_Checklist_HADCP.pdf
Author: John Stepnowski
Keywords/Tags:
5.4.3.1.D_TRBM_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf
Author: Carl Kammerer
Keywords/Tags: CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf
Author: Scott Mowery
Keywords/Tags: pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf
Author: Adam Grodsky;Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf
Author: Thomas F. Landon
Keywords/Tags: bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf
Author: Richard Bourgerie
Keywords/Tags: dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf
Author: FOD Team Leads
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
6.3.2.1.13_CO-OPS_Sensor_Elevation_Worksheet.pdf
Author: A. Sanford
Keywords/Tags:
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf
Author: Eddie Roggenstein
Keywords/Tags: maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
6.3.2.1.4_WaterTempComparisonSOP.pdf
Author: yumiko
Keywords/Tags: SOM,Station Operation and Maintenance
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf
Author: Jason Standridge
Keywords/Tags: SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal
6.3.2.1.7_Sutron_Xpert_Upgrade.pdf
Author: Kevin Harrison
Keywords/Tags:
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf
Author: Keith Brkich;Nathan Holcomb
Keywords/Tags: SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage,
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf
Author: Nathan Holcomb
Keywords/Tags: SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf
Author: Christopher McGrath
Keywords/Tags: current meter; horizontal; field library; operations; maintenance
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf
Author: Christopher Paternostro;Richard Bourgerie
Keywords/Tags: CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf
Author: Adam Grodsky
Keywords/Tags: SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf
Author: Adam.Grodsky@noaa.gov
Keywords/Tags: SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf
Author: Caleb Gostnell, SIL
Keywords/Tags: SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf
Author: Bruce Sevary
Keywords/Tags: reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx
Author: Greg Dusek
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf
Author: Chris Paternostro
Keywords/Tags: ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf
Author: Christopher Paternostro
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf
Author: Seth Baldelli
Keywords/Tags: met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf
Author: Carl Kammerer
Keywords/Tags: currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf
Author: Chris Paternostro
Keywords/Tags: hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.5_CTD_Analysis.pdf
Author: Kate Bosley
Keywords/Tags: ctd, conductivity, temperature, density, Castaway, Conductivity, Temperature, and Density (CTD) Observations Analysis
3.1.1.6_Desktop_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf
Author: Bruce Servary;Greg Dusek
Keywords/Tags: Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf
Author: Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli
Keywords/Tags:
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf
Author: Richard.Edwing
Keywords/Tags: NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf
Author: manoj.samant
Keywords/Tags: bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS
NGS-58.pdf
Author: juliana
Keywords/Tags:
3.2.3.3.C13_VDatum_Project_Guidelines.pdf
Author: Manoj Samant
Keywords/Tags: PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL,
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf
Author: CO-OPS Engineering Division
Keywords/Tags: SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf
Author: CO-OPS Engineering Division;Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf
Author: Manoj Samant, Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf
Author: Trevor Mackessy-Lloyd;Seth Baldelli
Keywords/Tags: Air Gap; Miros; WaterLog
3.2.3.5.E25_Hydraulic_Correctors_update_SOP_final.pdf
Author: manoj.samant
Keywords/Tags:
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf
Author: Stephen Gill, CO-OPS
Keywords/Tags: NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf
Author: Minilek Hailegeberel
Keywords/Tags: SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division
3.2.3.6.F10_Currents_Risk_Assessment.pdf
Author: Manoj Samant
Keywords/Tags: FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter
3.2.3.9.I4_EB_06_003_Modem_Setups.pdf
Author: Warren Krug
Keywords/Tags: telephone, phone, 56kb, voice, data, rockwell, com3, 115200, engineering bulletin
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf
Author: Warren Krug
Keywords/Tags: xterm, log on, recover missing data, engineering bulletin
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf
Author: Warren Krug
Keywords/Tags: ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf
Author: Warren Krug
Keywords/Tags: SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron
3.2.3.9.I13_EB_09_001_Create_Water_Temp_Sensor_Replacement_Cycle.pdf
Author: Caleb Gostnell
Keywords/Tags: engineering bulletin, sensor vintage, greater than 9 years old, 10 years old, replace, water temp sensor, CIL, SIL, Project Instructions
3.2.3.9.I15_EB_09_003_Xpert_LogSize.pdf
Author: Caleb Gostnell. POB
Keywords/Tags: sutron xpert, data collection platform, dcp, 09-003, log file, update log file size, external storage card log, storage card, flash disk, compact flash card
3.2.3.9.I16_EB_09_004_Verify_Archive_Paros_Sensor_Configuration_During_Annual_Inspection.pdf
Author: Caleb Gostnell
Keywords/Tags: engineering bulletin, configuration file corruption, improperly scaled data, saltwater/freshwater coefficient
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf
Author: Chris McGrath
Keywords/Tags: SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED
3.2.3.9.I20-1_Xpert2_v3.4.0.6_Firmware_Upgrade.pdf
Author: Kevin Harrison
Keywords/Tags: Engineering Bulletin 10-003 SOP, 10-003, xterm, sutron dcp upgrade, xpert2, xpert2 software, system, firmware, upload, file transfer
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf
Author: Caleb Gostnell (POB)
Keywords/Tags: engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf
Author: Jason Standridge
Keywords/Tags: geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS
3.2.3.9.I23_EB_11-003_SDI-12_Addresses_Update.pdf
Author: Jason Standridge
Keywords/Tags: sdi-12 protocol, designations, sensor, application, address
3.2.3.9.I24_EB_12_001_Replace_Xpert_IO_Modules_with_Firmware_Below_v2.01.pdf
Author: Caleb Gostnell
Keywords/Tags: analog and digital sensors, i/o module firmware version, Xpert, XDark, upgrade, Sutron, annual inspection,
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf
Author: Kasey Standridge, CIL
Keywords/Tags: Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf
Author: SIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf
Author: Chris McGrath
Keywords/Tags: SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf
Author: CIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I30_EB_17-001_Upgrade_Satlink2_to_Firmware_v7.41.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I31_EB_17-002_Upgrade_Xpert2_&_9210B_Dataloggers_to_OS_v3.19.0.10.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I32_EB_17-003_Standardize_the_Number_of_Digits_for_Transmitting_Conductivity_Data.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I34_EB_17-005_Standardize_MWWL_Sensor_Configuration_Parameters.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I35_EB_19-001_Polycarbonate_Tube_for_ATON_Application.pdf
Author: Chesapeake Instrument Lab
Keywords/Tags:
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf
Author: CIL;SIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf
Author: SIL;CIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf
Author: CIL;SIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf
Author: SIL;CIL
Keywords/Tags: SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf
Author: Caleb Gostnell
Keywords/Tags: SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I41_EB_23-001_CO-OPS_SDI-12_Address_Assignments_Update.pdf
Author: Chris McGrath
Keywords/Tags: SDI-12; designations; sensor; address; Sensor Setup; sdi-12 protocol
3.2.3.9.I42_EB_23-002_CO-OPS_Standard_WaterLOG_Radar_Sensor_Configuration_Parameters.pdf
Author: Chris McGrath
Keywords/Tags: waterlog; radar; MWWL; engineering bulletin; water level; microwave; sensor; configuration; parameters; H-3611; Nile; NOAA Nile; 502; 203360
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf
Author: Chris McGrath
Keywords/Tags: waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile
3.2.3.9.I44_EB_23-004_Limited_Release_of_Operating_System_4.0.0.20_for_the_XPERT_Family_of_Dataloggers.pdf
Author: Chris McGrath
Keywords/Tags: 4.0.0.20; XPERT2; XPERT Dark 2; 9210B; Datalogger; operating system; OS
3.2.3.9.I45_EB_23-005_CO-OPS_GOES_Flags_and_DPAS_Codes_Update.pdf
Author: Chris McGrath
Keywords/Tags: GOES Flag; DAPS Code; GOES; PORTS Tag; sensor; designations; engineering bulletin; format; formating
3.2.3.12.3-L1_cGNSS_System.pdf
Author: Robert Heitsenrether
Keywords/Tags:
3.2.3.12.3-L2_cGNSS_Level_Method.pdf
Author: Eric Breuer
Keywords/Tags:
3.2.3.12.3-L3_cGNSS_Metadata.pdf
Author: Adam Grodsky
Keywords/Tags:
3.3.1.1_Submission_of_Documentation_to_ERB.pdf
Author: Manoj Samant, Bruce L. Servary, Jr.
Keywords/Tags: template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
3.3.1.2_Submission_of_Documentation_to_FERS.pdf
Author: Warren Krug
Keywords/Tags: field engineering review subcommittee, review board, best engineering practices, project documents, project team, required design, project lead, cover letter template, project description, system, CAD, FERS
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf
Author: Rachel Krasna, Steve Bassett
Keywords/Tags: SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist
Filename Author Keywords/Tags
5.1.2.2.A_Roles_and_Responsibilities_and_Work_Flow_Diagram_For_NCOP_Operations.pdf Patrick Burke SOM, Station O&M, NCOP, current survey, planning, requirements, execution, deployment, recovery, installation, data processing, reconaissance, procurement, outreach, dissemination, current meter, recon
6.6.1.1_Review_Protocol_for_Contractor_Submitted_Deliverables.pdf Adam Grodsky;Richard Bourgerie SOM, Station Operation and Maintenance, CECAT,COR,Contracting Officers Representative,DCP,DMAT,IDIQ,MOU,OET,OPUS,TM, task manager, TOMIS
5.2.1.6_Installation_Readiness_Checklist_for_Self_Contained_Current_Surveys.pdf Eddie Roggenstein FIPL, Field Installation Project Lifecycle, NCOP, ADCP, platform, planning, overview, current meter, deployment, permit, CIL, SIL
5.2.2.6_Equipment_&_Tools_For_Install-Self-Contained_Current_Surveys.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, Field Operations Division, current meter, NCOP, circulation survey, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, CART, UAT, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.2.2.5_Equipment_&_Tools_For_Install-Real-Time_Currents.pdf Kasey Standridge FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy
5.3.1.1.C_WaterLogField_Installation_Guide_V_1.0.pdf Robert Heitsenrether;OSTEP FIPL, Field Installation Project Lifecycle, installation, MWWL, microwave, water level, sensor, sutron, waterlog, OSTEP, Ocean Systems Test and Evaluation Program
5.3.3.3_Anti-Fouling_Procedures_for_Current_Meters.pdf Kasey Standridge ncop, current meter, biofouling, anti-fouling, growth, deployment, FIPL, Field Installation Project Lifecycle
3.2.3.2.B2_User's_Guide_for_8200_Bubbler_Gauge.pdf CO-OPS Engineering Division SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD
3.2.3.2.B3_User's_Guide_for_8210_Water_Level_Gauge_for_Hydrographic_Surveying_Applications.pdf CO-OPS Engineering Division SOM, Station O&M, water level, DCP, Sutron, NWLON, PORTS, ED, FOD, pressure, bubbler, pressure control panel, hydro, paros
5.4.1.1.C1_GOES_Enabled_Portable_Tide_Gauge_Setup&Use.pdf Caleb Gostnell;Lynn Asbeck;Keith Brkich 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,message,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
5.4.1.1.C2_Iridium_Enabled_Portable_Tide_Gauge_Setup&Use.pdf Keith Brkich;Caleb Gostnell;Daniel Johnson 9210,9210B,AOB,Atlantic Operations Branch,Chesapeake Instrument Lab,CIL,Coast Survey,Data Collection Platform,DCP,decode,DOMSAT,Field Operations Division,GOES,FOD,hydro,IMEI,Instument Lab,Iridium,message,modem,OCS,orifice,Pacific Operations Branch,Paros,Paroscientific,Pelican,POB,Portable,PTG,satlink,Seattle Instrument Lab,signal strength,SIL,ssp.log,Sutron,Tide Gauge,transmission,transmit,tx,WaterLog,Xpert,xterm
Field_Installation_Guide_for_Greenspan_EC3000_CT_Sensor.pdf OSTEP FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, OSTEP, Ocean Systems Test and Evaluation Program, Deployment, CIL, SIL, instrument lab
5.4.1.4A1_Barometer_Calibration_Procedure_Druck_DPI740.pdf Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4A2_Barometer_Calibration_Procedure_Omega_HHP360.pdf Kathleen.Bailey@noaa.gov;Caleb Gostnell;Lynn Asbeck SOM, Station Operation and Maintenance, installation, recalibrate, handheld, thermistor, CIL, SIL, FOD, field, Xpert, SDI
5.4.1.4.B_Wind_Sensor_Alignment_Procedure_for_RMYoung_Wind_Monitor.pdf Darren Wright, James Sprenke, Charles Payton SOM, Station O&M, wind, anemometer, alignment, maintenance, GPS, met, R.M. Young, windbird, propeller, heading, direction, magnetic, offset, compass
5.4.1.5.O_Hydraulic_Corrector_Field_Application_for_Referencing_the_International_Great_Lakes_Datum_of_1985_03-28-2012.pdf yumiko
5.4.1.5.P_Procedure_to_Establish_a_Meteorological_Sensor_Reference_Mark_and_Measure_Meteorological_Sensor_Heights.pdf Adam Grodsky, COET SOM, station operation and maintenance, O&M, SRM, installation
3.2.3.3.C14_Preliminary_Leveling_Procedures.pdf Manoj Samant SOM, Station O&M, NGS, FOD, Field operations Division, backsight, foresight, bench mark
3.2.3.3.C18_Creating_a_Bench_Mark_Diagram_in_PDF_Format_SOP.pdf Loren Evory, FOD bench mark diagram, pdf, bm sketch, jpg, snagit, .des file, windesc, google earth, diagram, bm, ESS, Engineering and System Specifications, COET, Configuration and Operational Engineering Team
3.2.3.3.C2_Users_Guide_For_Writing_Bench_Mark_Descriptions.pdf Engineering Division, CO-OPS bluebook, ngs, general locator, taped measurements, compass directions, bench mark descriptive text, to reach statement, windesc, code, recovery type, setting, marker type, monumentation, agency, condition, stability, conversion rules, metric units, english units, directions, landmarks, published, locator, writing, measurements, vertical
3.2.3.3.C3_Users_Guide_for_Electronic_Levels_with_Translev_and_WinDesc.pdf Bruce L. Servary, Jr windesc, translev, leica, wild, na3000, na3003, .dat files, rod level bubble, level collimation checks, rec-module, dna03, keypad, screens, .inx file, fgcs standards, inst.dat files, rods.dat files, desc.exe, contrib.dat, country.dat, cors.dat, ssn, spsn, pid, descriptive text, wind code, weather code, sun code, observer code, error codes, user key, gif 10, dsworld, google earth
3.2.3.3.C4_Users_Guide_for_GPS_Observations.pdf Manoj Samant, Artara Johnson global positioning system, gps, observations, terrestrial reference frame, itrf, north american datum of 1983, nad 83, online positioning user service, opus, opusdb, national geodetic survey, ngs, static, gps observation, differential, gps surveys, gps satellites, choke ring antenna, ground plane antenna, fixed-height tripod, epoch update, recording interval, elevation mask, north american vertical datum of 1988, navd 88, national spatial reference system, nsrs, orthometric, ellipsoidal navd 88 level tie, gps tie, stability code, federal base network, fbn, cooperative base network, cbn, gps water level station bench mark, gpsbm, photos, cors
3.2.3.3.C8_Attachment_V_-_Setting_a_NGS_3-D_Monument.pdf George Leigh, Curtis Smith, National Geodetic Survey (NGS) 3-d rodmark, three dimensional, stainless steel rod, rod mark, ngs, 3-dimensional, 3-d, geodetic bench marks, monument, 3d, datum point, concrete, cement, sand, threaded stud, grease filled sleeve, logo cap, coastal
3.2.3.3.C9_Attachment_R_-_Requirements_for_Digital_Photographs.pdf George Leigh, Kevin Bashant, National Geodetic Survey (NGS) digital photographs, survey mark photographs, description of photographs, photograph file name, reconnaissance photographs, bench mark photographs, survey control, photographs, benchmark photos, coastal mapping program, shoreline mapping, image, file, eye-level, horizontal, PID
3.2.3.3.C10_Attachment_T_-_Setting_a_Concrete_Mark.pdf George Leigh, Kevin Bashant, NGS concrete, mark, monument, bench, aggregate, cement, portland, setting, shoreline, mapping, NGS, monuments, cure, destructive, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
3.2.3.3.C11_Attachment_U_-_Setting_a_Survey_Disk_in_Bedrock.pdf George Leigh, Kevin Bashant, NGS outcrop, disks, geodetic, bench, mark, setting, concrete, monument, shoreline, mapping, NGS, cure, epoxy, porous, mixing, placing, curing, witness posts, Miss Utility, magnetic, FOD, Field Operations Division, Station Operation and Maintenance, SOM
5.2.2.2.A_Air_Gap_Field_Installation_Guide.pdf Warren Krug;Kathleen Bailey FIPL, Field Installation Project Lifecycle, FOD, Field Operations Division, XPert, eSite, DCP, OET, laser, microwave, MIROS, low steel, OSTEP, Deployment, Sutron, Xpert, 9210B, DCP, Universal Laser Sensor, ULS, Miros, Laser, reconnaissance, bridge, clearance, CIL, SIL, instrument, lab, chesapeake, seattle, PORTS
cGNSS_Field_Installation_Guide.pdf Robert Heitsenrether
Field_Installation_Guide_for_Iridium_ATON_Current_Measurement_System.pdf Winston Hensley, Christopher Haith, Robert Heitsenrether
5.4.3.1.A_Real_Time_Currents_Station_Maintenance_Checklist.pdf Kasey Standridge ncop,adcp,adp,current meter,deployment,recovery,ports,platform
5.4.3.1.C_AtonAssemblyChecklist.pdf FOD FIPL, Field Installation Project Lifecycle, ports, real-time, ncop, aton, nortek, buoy, current meter, installation, CIL, Chesapeake Instrument Lab
5.4.3.2.A_TRBM_Spare_Parts_Listing.pdf CIL FIPL, Field Installation Project Lifecycle, CIL, SIL, ncop, current meter, survey, adcp, platform, currents, deployment, gimbal, trawl resistant, bottom mount
5.4.3.1.E_TRDI_checklist.doc Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
5.4.4.1.A.1_NCOP_Current_Station_Log.pdf Carl Kammerer ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, station report
5.4.4.1.A_NCOP_Current_Station_Log_Instructions.pdf Carl Kammerer, CECAT FIPL, Field Installation Project Lifecycle, ncop, adcp, adp, platform, currents, current meter, deployment, recovery, installation, log, station log, current survey, CECAT, Coastal and Estuarine Circulation Analysis Team
5.4.4.1.D_ARGOS_Recovery_SOP.pdf Chris Paternostro CECAT, FIPL, Field Installation Project Lifecycle, CECAT, field, FOD, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT, search, recovery, deployment, CORMS, coordinate
5.4.4.2.A_Hardware_and_Tool_List_for_NCOP_Field_Work.pdf Jennifer Ewald FIPL, Field Installation Project Lifecycle, CECAT, FOD, current meter, NCOP, circulation survey, DPT, Data Processing Team, NPDB, ADCP, C-MIST, WinADCP, SonTek, Nortek, RDI, ARGOS, pinger, profiler, bin, ensemble, deployment, recovery, coast, estuary, harbor, river, channel, basin, river, inlet, flow, velocity, buoy, TRBM
3.2.3.5.E17_Excel_Based_Xpert_Site_Report.xls Mickey K. Moss, Rolin Meyer, Dave Jones, Bruce Servary SOM, Station O&M,NWLON, station, OET, ED, Engineering Division, FOD, Field Operations,GOES, NESDIS, satellite,antenna, plat, platform id, azumith, elevation, cutter,SOLAR PANELS,9210,XPERT DARK, ANCILLARY SENSORS,AQUATRAK SENSOR,AQUATRAK SOUNDING TUBE,DIVE INFO,GPS,LEVEL,XPERT
5.5.1.1_CO-OPS_Coastal_Water_Level_Stations_Requirements_for_Documentation_and_Deliverables.pdf
5.5.3.1.A_eSite_User's_Guide.pdf Trevor.Mackessy-Lloyd eSite, contractor, account, report, maintenance, operation, field, work, requirements, FIPL, Field installation project lifecycle, OET, engineering, configuration, team, work, sensor, system
3.2.3.6.F7_Guidelines_for_Acquiring_Ship_Services.pdf Chris Paternostro ncop, vessel, ship, boat, reconnaissance, survey, currents, current meter, FIPL, Field Installation Project Lifecycle
4.1.3.1_Chesapeake_Instrument_Lab_Equipment_Request_Form.pdf
4.1.3.2_Seattle_Instrument_Lab_Equipment_Request_Form.pdf Chris McGrath Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, SIL
4.1.3.3_Chesapeake_Instrument_Lab_Government_to_Government_Equipment_Transfer_Form.pdf CIL 9210, ADCP, ADP, Accubar, Acoustic, Adapter, Air Gap, Airlink, Analog, Anemometer, Aquadopp, Aquatrak, ARGOS, ATON, Barometer, Barometric Pressure, Batteries, Battery, BEI, Benthos, Bracket, Bridge Clearance, Bubbler, CART, Coastal Acoustic Release Transponder, Communications, Conductivity, Connectors, Contractors, CTD, Current Meter, Data Logger, DCP, Data Collection Platforms, Deployment, Digital, Druck, Enclosure, Equipment, Falmouth, FedEx, Floatation Technologies, Forms, Freight, Gel Cell, GFE, Government Furnished Equipment, GPS, GOES, Geostationary Orbital Environmental Satellites, Greenspan, HADCP, HADP, Horizontally Mounted Current Meter, HF Radar, Hydrography, I/O, IMO, IP, Internet Protocol, Modem, KPSI, Laser, LOS, Line of Sight, Mail, Meteorological, Microwave, Miros, Modem, MWWl, Microwave Water Level, Orfice, Package, Paroscientific, PCMCIA, Platforms, Pressure, Pressure Transducer, Raven XT, Relative Humidity, Release, Replacement, R.M. Young, Satlink, Seasonde, Sensor, Station, SOM, Station O&M, operation and maintenance, CIL
4.1.3.4_Report_of_Government_Property_in_Possession_of_Contractor_(CD-281).pdf U.S. Department of Commerce expendable, non-expendable, condition, location, cost, control, quantity, description, SOM, Station O&M
4.1.3.5_CIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, Chesapeake Instrument Lab
4.1.3.6_SIL_Station_Configuration_Form.pdf CO-OPS Contractors, Deployment, Equipment, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, seattle instrument lab
4.1.3.7_CO-OPS_Equipment_Return_Form.pdf CO-OPS Contractors, Forms, GFE, Government Furnished Equipment, Replacement, Sensor, Station, SOM, operation and maintenance, CIL, chesapeake instrument lab
3.2.3.6.F12_Guidelines_and_Requirements_for_Equipment_Shipping.pdf CECAT freight, mail, ship, package, fedex, ups, ncop, FIPL, Field Installation Project Lifecycle, Coastal and Estuarine Circulation Analysis Team, CECAT
3.2.3.5.E8_Request_GOES_Platform_ID_Allocations.pdf Bruce Servary, OET goes, allocations, data collection platform, dcp, nesdis, wallops, wallops command and data acquisition, cda, data collection system automatic processing system, daps, platform description table, pdt, channel, transmit, azimuth, FIPL, Field Installation Project Lifecycle
4.3.1.2_(B1)_Sutron_Xpert_Operations_and_Maintenance_Manual.pdf Sutron Corporation COPYRIGHT 2010, SUTRON CORPORATION. USED WITH PERMISSION. Contractors, Currents, Data, Data Logger, Data Collection Platform, DCP, Deployment, Equipment, GFE, Government Furnished Equipment, Guide, Installation, Maintenance, Monitoring, Platforms, Project Instructions, PORTS, Report, Software, Station, Tides, ESS, Engineering and System Specifications
3.2.3.5.E7_WL_Records_Evaluation_Criteria.pdf Thomas F. Landon ed, oet, fod, pob, aob, field, documentation, site, report, task, manager, contractor, water level, station, quality, submitted, dms, dpas, nwlp, ports, metadata, preliminary, revised, final, 30, day, 30-day, deliverable, timeliness, AI, annual, inspection, eSite, XPert, DCP, sounding, tube, well, GPS, Station Operation and Maintenance, SOM
7.3.B.1.1_C-MIST_User_Manual.pdf Paul Fanelli;CECAT dissemination, analysis, instability, error, PORTS, principal, direction, pitch, roll, heading, pressure, ping, ensemble, station, sensor, depth, number, echo, intensity, last, good, cell, size, bin, sampling, rate, blanking, distance, Product, Generation, PGQC, DPT, CMIST, DMAT, CORMS
6.2.1.1.2_LevelRodRe-Calibration.pdf Dave Hatcher
6.2.1.2.1_Tools_Checklist_HADCP.pdf John Stepnowski
5.4.3.1.D_TRBM_checklist.pdf Carl Kammerer CECAT, ncop, adcp, platform, current meter, deployment, FIPL, Field Installation Project Lifecycle, flotation
5.4.3.1.E_TRDI_checklist.pdf Carl Kammerer CECAT, rdi, current, meter, deployment, ncop, fipl, Field Installation Project Lifecycle
6.2.5.1_Pre-Notification_of_Planned_Maintenance.pdf Scott Mowery pre-notification communications, station maintenance, contractor, partner, task manager, planned maintenance, maintenance activity, field crew chief,SOM, Station O&M, CIL, SIL, instrument lab, CORMS
3.2.3.5.E28_Pre-trip_Coordination_Meeting.pdf Adam Grodsky;Minilek Hailegeberel SOM, Station O&M, OET, FOD, Field Operations Division, Maintenance, AI, IDIQ, ED, Engineering Division, requirements, Project Instuctions, documentation, site report, eSite, SIL, CIL, instrument lab, dpt, dmat, dt, ust
3.2.3.3.C17_Leveling_Frequency_Requirements.pdf Thomas F. Landon bench marks, leveling, frequency, station datum, bracketing, zero reference, brackets, provisionally operational, fully operational, re-leveling, provisional, vertical movement, stability, check set of levels, tidal datums
6.3.1.2_Requirements_for_Reporting_During_Maintenance_of_Real-time_Current_Stations.pdf Richard Bourgerie dmat, maintenance, report, current meter, ports, real-time, metadata
6.3.2.1.0_Scheduled_Maintenance_Checklist_for_Water_Level_Stations.pdf FOD Team Leads SOM, Station O&M, FOD, Field Operations Division, Pre-trip, metadata, SM Checklist
6.3.2.1.13_CO-OPS_Sensor_Elevation_Worksheet.pdf A. Sanford
3.2.3.4.D1_CO-OPS_Specs_and_Deliverables_for_the_Installation,_Maintenance_and_Removal_of_WL_Stations.pdf CO-OPS Engineering Division Engineering and System Specifications, ESS, operation and maintenance, geodetic connections, field requirements, reference datum requirements, data quality monitoring, nwlon, tide staff, staff, leveling, leveling frequency, station documentation, deliverables, point of contact, timeline, bottom mounted pressure gauge
6.3.2.1.3_Maintenance_Procedure_for_Visibility_Sensor_Cleaning_and_Calibration_Check.pdf Eddie Roggenstein maintenance, visibility, sensor, cleaning, calibration, Vaisala, PORTS
6.3.2.1.4_WaterTempComparisonSOP.pdf yumiko SOM,Station Operation and Maintenance
6.3.2.1.6_Xpert_and_Xpert_Dark_Internal_Battery_Replacement.pdf Jason Standridge SOM, Station O&M,RTU,Remote Telemetry Unit,DCP,Data Collection Platform,CIL,Chesapeake Instrument Lab,SIL,Seattle Instrument Lab,coin cell battery, GOES,transmit, lithium, GPS, signal
6.3.2.1.7_Sutron_Xpert_Upgrade.pdf Kevin Harrison
6.3.2.1.9_Exporting_Xpert_Data_Using_'Xpert_Offline'.pdf Caleb Gostnell SOM, Station O&M, download, data, log, files, compact flash, disk, sd, storage, card, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron, Xpert Offline, dcp
6.3.2.1.12_Battery_Load_Testing_Procedures_for_CO-OPS_Water_Level_Observation_Systems.pdf Keith Brkich;Nathan Holcomb SOM, Station O&M, PowerSonic, DCP, SIL, CIL, 9210, Sutron, voltage,
6.3.2.1.14_Logging_and_Transmitting_Ancillary_Battery_Voltages_for_NWLON_Stations.pdf Nathan Holcomb SOM, Station O&M, DCP, SIL, CIL, 9210, Sutron, voltage, Xpert, Sutron, NWLON, GOES, charging, voltage dividing cable, pump box, AIO1
6.3.2.1.15_Satlink_3_Firmware_Upgrades_v8.28.pdf Caleb Gostnell SOM, Station O&M, 9210, Xpert, Sutron, DCP, linkcomm
6.3.2.2.4_Maintenance_Checklist_for_Horizontally_Mounted_Current_Meters.pdf Christopher McGrath current meter; horizontal; field library; operations; maintenance
6.3.2.2.5_Guidelines_for_the_Emergency_Recovery_of_a_Current_Meter.pdf Christopher Paternostro;Richard Bourgerie CECAT, SOM, Station O&M, CECAT, field, FOD, biofouling, acoustic release, remote, pop-up, platform, mount, ADP, ADCP, SUBS, TRBM, ES2, buoy, failure, ARGOS, contractor, vessel, boat, drag, tracking, transmission, CART, surface, signal, grapple, dive, mooring, position, latitude, longitude, buried, NRT
6.3.3.1_Clarification_of_Requirements_for_Documentation_Deliverables.pdf Adam Grodsky SOM, Station O&M, metadata requirements, co-ops field systems, ed, oet, engineering division, operational engineering team, preliminary documentation, revised final documentation, task manager, contractor, idiq
6.3.4.2_Calculation_Ingestion_GL_Spike_Reading.pdf Adam.Grodsky@noaa.gov SOM, Station O&M, database, OceanData, shaft angle encoder, SAE, intake valve, sump, gaps, bench mark, OET, COET, outliers, ETG
6.5.1.1.11_Paros_Configuration_Verification_SOP.pdf Caleb Gostnell, SIL SOM, Station O&M, paros, paroscientific, coefficient, saltwater, freshwater, FOD, OET, ED, digiquartz, SIL, CIL
3.1.1.1_CO-OPS_Water_Level_and_Meteorological_Site_Recon_Procedures.pdf Bruce Sevary reconnaissance, water level, meteorological, equipment, siting requirement, field note, reconnaissance form
3.2.3.6.F1_Current_Meter_Site_Reconnaissance_Log.xlsx Greg Dusek currents, reconnaissance, station, adcp, adp, ncop,FIPL, Field Installation Project Lifecycle
3.2.3.6.F3_RBR-CTD_setup_and_data_retrieval.pdf Chris Paternostro ctd, conductivity, temperature, depth, rbr, reconnaissance, ncop, currents, FIPL, Field Installation Project Lifecycle,
3.2.3.6.F4_Ponar_or_Van_Veen_Bottom_Grab_Procedures.pdf Christopher Paternostro ncop, reconnaissance, bottom grab, currents, platform, sample, FIPL, Field Installation Project Lifecycle
3.2.3.6.F5_Current_Meter_Recon_Procedures.pdf Christopher Paternostro currents, reconnaissance, station, adcp, adp, ncop, FIPL, Field Installation Project Lifecycle
3.1.1.2_CO-OPS_Meteorological_Reconnaissance_Form.pdf Seth Baldelli met, meteorological, form, recon, reconnaissance
3.1.1.3_CO-OPS_Current_Meter_Reconnaissance_procedures.pdf Carl Kammerer currents, reconnaissance, station, adcp, adp, ncop, recon, FIPL, Field Installation Project Lifecycle
3.1.1.4_HF-SCM_Recon_Checklist.pdf Chris Paternostro hfradar, codar, high frequency, currents, ncop, antenna, hfscm, radar, reconnaissance, site, FIPL, Field Installation Project Lifecycle
3.1.1.5_CTD_Analysis.pdf Kate Bosley ctd, conductivity, temperature, density, Castaway, Conductivity, Temperature, and Density (CTD) Observations Analysis
3.1.1.6_Desktop_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
3.1.1.7_Field_Recon_SOP.pdf Bruce Servary;Greg Dusek Field Installation Project Lifecycle, FIPL, CECAT, FOD, current meter, recon, reconnasaince, NCOP, circulation, survey, coast, estuary, harbor, river, channel, basin, river, inlet, flow, physical oceanography, inflow, diurnal, semi-diurnal, subtidal, cross-channel, upwelling, velocity, bathymetry, bathymetric, shoaling, bottom type, shoaling, OCS, NGS, waterway, survey, buoy, spatial, saltwater, freshwater, density, vertical, horizontal, water, variation, instrument, dredging
System_Design_for_Iridium_ATON_ADCP_Real-Time_Current_Measurement_System.pdf Winston Hensley, Bob Heitsenrether, Christopher Haith, Paul Fanelli
3.2.3.1.A1_NGWLMS_Site_Design_Preparation_and_Installation_Manual.pdf Richard.Edwing NGWLMS, cal tube, worksheet, sutron 9000, design parameters, top hat , sounding tube, sounding tube assembly, coefficient 2, calibration tube, sensor test worksheet, thermistor separation, FIPL, Field Installation Project Lifecycle, COET, Configuration and Operational Engineering Team
3.2.3.3.C4_User's_Guide_for_GNSS_Observations.pdf manoj.samant bench mark, gps, gnss, tide station, user's guide, observations, photos, leveling, survey, OPUS, NGS
NGS-58.pdf juliana
3.2.3.3.C13_VDatum_Project_Guidelines.pdf Manoj Samant PPP, programmatic policies and procedures, datums, requirements, field, updates, water level stations, tidal, GPS, CSDL,
3.2.3.4.D5_Water_Level_Station_Specs_for_NGS_Projects.pdf CO-OPS Engineering Division SOM, Station O&M, operation and maintenance, Tide, water level, requirements planning, Tidal zoning, NWLON, Subordinate, monitoring, maintenance, Data, quality control, processing, tabulation, Tidal datum, field requirements, leveling, station documentation, deliverables
3.2.3.5.E1_Standing_Project_Instructions_Nov_2020.pdf CO-OPS Engineering Division;Minilek Hailegeberel SOM, Station O&M, CO-OPS, Engineering Division, ED, Field Operations Division, FOD, NWLON, NWLP, reference datum, reconnaissance, water level, sensor specifications, GOES satellite transmissions,great lakes, leveling, elevated platforms, bench marks, datum offsets, orifice offset, navd88, leveling, gps connections, deliverables, timelines, documentation
3.2.3.5.E3_Upgrading_an_Existing_Water_Level_Station_or_Installing_a_New_Water_Level_Station.pdf Manoj Samant, Minilek Hailegeberel SOM, Station O&M, cil, sil, tester, installer, request station number, preliminary site report, preliminary eSite, preliminary esite, testing information, dpas testing, dpas, dms, configure test station, FOD, field operations, ED, engineering, NWLON, AOB, POB
3.2.3.5.E23_Air_Gap_Database_Configuration_and_Offset_Calculation.pdf Trevor Mackessy-Lloyd;Seth Baldelli Air Gap; Miros; WaterLog
3.2.3.5.E25_Hydraulic_Correctors_update_SOP_final.pdf manoj.samant
3.2.3.5.E26_Requirements_For_Relocating_NWLON_Stations.pdf Stephen Gill, CO-OPS NWLON, data continuity, station, level, datum, location, simultaneous, gaps, sea level rise, recovery, summary, observing systems manager
3.2.3.5.E27_eSite_Report_Account_Creation_and_Maintenance.pdf Minilek Hailegeberel SOM, Station O&M, AAM, Application Access Management, activation, OET, FOD, Field Operations Division, COR, IDIQ, ED, Engineering Division
3.2.3.6.F10_Currents_Risk_Assessment.pdf Manoj Samant FIPL, Field Installation Project Lifecycle, NCOP, mount, criteria, current meter
3.2.3.9.I4_EB_06_003_Modem_Setups.pdf Warren Krug telephone, phone, 56kb, voice, data, rockwell, com3, 115200, engineering bulletin
3.2.3.9.I6_EB_07_002_Adding_a_Login_to_Xperts_for_DPAS_Data_Recovery.pdf Warren Krug xterm, log on, recover missing data, engineering bulletin
3.2.3.9.I9_EB_07_005_Iridium_Setup.pdf Warren Krug ip, wireless, leo, satellite, world communication center, wcc, procomm, engineering bulletin, Iridium Modem, Model A3LA-D, antenna, installation
3.2.3.9.I10_EB_07_007_Exporting_Xpert_Data_Using_Xterm.pdf Warren Krug SOM, Station O&M, download, data, log, files, flash, disk, storage, card, engineering bulletin, xterm, gui, usb, serial, 115200, 9600, retrieval access, setup access, comma delimited, 9210, Xpert, Sutron
3.2.3.9.I13_EB_09_001_Create_Water_Temp_Sensor_Replacement_Cycle.pdf Caleb Gostnell engineering bulletin, sensor vintage, greater than 9 years old, 10 years old, replace, water temp sensor, CIL, SIL, Project Instructions
3.2.3.9.I15_EB_09_003_Xpert_LogSize.pdf Caleb Gostnell. POB sutron xpert, data collection platform, dcp, 09-003, log file, update log file size, external storage card log, storage card, flash disk, compact flash card
3.2.3.9.I16_EB_09_004_Verify_Archive_Paros_Sensor_Configuration_During_Annual_Inspection.pdf Caleb Gostnell engineering bulletin, configuration file corruption, improperly scaled data, saltwater/freshwater coefficient
3.2.3.9.I19_EB_10-002_Standardized_Battery_Type.pdf Chris McGrath SOM, Station O&M, engineering bulletin, PowerSonic, ultrasonic, 12v, volts, power, amps, CIL, SIL, lead-acid, Measurement Systems Configuration Subcommittee, MSCS, solar, voltaic, charging, polypropylene, polyethylene, copolymer, oxide, FOD, ED
3.2.3.9.I20-1_Xpert2_v3.4.0.6_Firmware_Upgrade.pdf Kevin Harrison Engineering Bulletin 10-003 SOP, 10-003, xterm, sutron dcp upgrade, xpert2, xpert2 software, system, firmware, upload, file transfer
3.2.3.9.I21_EB_11_001_Change_in_Pump_Fuse_Capacity.pdf Caleb Gostnell (POB) engineering bulletin, design analysis, h-3551, sdi-12 communications, 10a fuse, h-355 pumps, WaterLOG, bubbler, systems, pump, compressor
3.2.3.9.I22_EB_11-002_GOES_Battery_Flag_Standardization.pdf Jason Standridge geostationary orbital environmental satellites, remote telemetry , <, enhanced diagnostics, GOES, pseudo-binary, telemetry, MSCS
3.2.3.9.I23_EB_11-003_SDI-12_Addresses_Update.pdf Jason Standridge sdi-12 protocol, designations, sensor, application, address
3.2.3.9.I24_EB_12_001_Replace_Xpert_IO_Modules_with_Firmware_Below_v2.01.pdf Caleb Gostnell analog and digital sensors, i/o module firmware version, Xpert, XDark, upgrade, Sutron, annual inspection,
3.2.3.9.I25_EB_14_001_Real_Time_Currents_Pre-Deployment_Testing_Procedural_Change.pdf Kasey Standridge, CIL Nortek and Sontek current meters, in-water testing, bench test, field deployment, sensor, instrument, pre-deployment, CIL, Chesapeake Instrument Lab
3.2.3.9.I26_EB_15-001_Correct_GOES_Flag_for_Backup_Battery_Voltage.pdf SIL SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I27_EB_15-002_Upgrade_Satlink2_to-v7.24.pdf Chris McGrath SOM, Station O&M, engineering bulletin, the Geostationary Operational Environmental Satellite, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I28_EB_15-003_Review_System_log_for_Suspicious_Activity.pdf CIL SOM, Station O&M, engineering bulletin, MSCS, CIL, SIL, Measurement Systems Configuration Subcommittee, Xpert, FOD, ED
3.2.3.9.I29_EB_13-001_Upgrade_Xpert_Software_to_v2.10.0.4.pdf Caleb Gostnell SOM, Station O&M, engineering bulletin, XPert, DCP, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I30_EB_17-001_Upgrade_Satlink2_to_Firmware_v7.41.pdf Chesapeake Instrument Lab
3.2.3.9.I31_EB_17-002_Upgrade_Xpert2_&_9210B_Dataloggers_to_OS_v3.19.0.10.pdf Chesapeake Instrument Lab
3.2.3.9.I32_EB_17-003_Standardize_the_Number_of_Digits_for_Transmitting_Conductivity_Data.pdf Chesapeake Instrument Lab
3.2.3.9.I34_EB_17-005_Standardize_MWWL_Sensor_Configuration_Parameters.pdf Chesapeake Instrument Lab
3.2.3.9.I35_EB_19-001_Polycarbonate_Tube_for_ATON_Application.pdf Chesapeake Instrument Lab
3.2.3.9.I36_EB_20-001_Upgrade_Satlink3_to_Firmware_v8.28.pdf CIL;SIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I37_EB_20-002_Document_and_Replace_Trimble_Bullet_III_GPS_Antennas.pdf SIL;CIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, Antcom, Goes Format File, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I38_EB_20-003_Replace_RV50_IP_Modem_Antennas.pdf CIL;SIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I39_EB_20-004_Standardize_to_40W_Solar_Panels.pdf SIL;CIL SOM, Station O&M, engineering bulletin, GOES, remote telemetry, eSite, power, MSCS, wide band digital antenna, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I40_EB_21-001_Update_Iridium_Epoch.pdf Caleb Gostnell SOM, Station O&M, engineering bulletin, Iridium, Sutron, Xpert, remote telemetry, eSite, MSCS, sbd transmitter, CIL, SIL, Measurement Systems Configuration Subcommittee, FOD, ED
3.2.3.9.I41_EB_23-001_CO-OPS_SDI-12_Address_Assignments_Update.pdf Chris McGrath SDI-12; designations; sensor; address; Sensor Setup; sdi-12 protocol
3.2.3.9.I42_EB_23-002_CO-OPS_Standard_WaterLOG_Radar_Sensor_Configuration_Parameters.pdf Chris McGrath waterlog; radar; MWWL; engineering bulletin; water level; microwave; sensor; configuration; parameters; H-3611; Nile; NOAA Nile; 502; 203360
3.2.3.9.I43_EB_23-003_CO-OPS_Standard_WaterLOG_Long_Range_Radar_Sensor_Configuration_Parameters.pdf Chris McGrath waterlog; radar; air gap; engineering bulletin; bridge clearance; microwave; sensor; configuration; H-3612; 517; Nile
3.2.3.9.I44_EB_23-004_Limited_Release_of_Operating_System_4.0.0.20_for_the_XPERT_Family_of_Dataloggers.pdf Chris McGrath 4.0.0.20; XPERT2; XPERT Dark 2; 9210B; Datalogger; operating system; OS
3.2.3.9.I45_EB_23-005_CO-OPS_GOES_Flags_and_DPAS_Codes_Update.pdf Chris McGrath GOES Flag; DAPS Code; GOES; PORTS Tag; sensor; designations; engineering bulletin; format; formating
3.2.3.12.3-L1_cGNSS_System.pdf Robert Heitsenrether
3.2.3.12.3-L2_cGNSS_Level_Method.pdf Eric Breuer
3.2.3.12.3-L3_cGNSS_Metadata.pdf Adam Grodsky
3.3.1.1_Submission_of_Documentation_to_ERB.pdf Manoj Samant, Bruce L. Servary, Jr. template, engineering review board, engineering design, compatibility, best engineering practices, projects transition from ros step 2 to step 3, project documents, project team, required design documentation, project lead, nwlon, ports, coastal, ncop, vdatum, co-ops observing systems
3.3.1.2_Submission_of_Documentation_to_FERS.pdf Warren Krug field engineering review subcommittee, review board, best engineering practices, project documents, project team, required design, project lead, cover letter template, project description, system, CAD, FERS
2.2.7.1_CO-OPS_Environmental_Compliance_Best_Management_Practices_Checklist_for_Station_Maintenance.pdf Rachel Krasna, Steve Bassett SOM, Station O&M, FOD, Field Operations Division, Scheduled Maintenance, SM Checklist, Best Management Practices, BMP, Environmental Compliance, EC Checklist
Last modified: 2024-02-22 16:00 UTC